Capenhurst
Capenhurst is a battery energy storage asset in Great Britain. This page shows its published identity, approximate location, dispatch and revenue.
Revenue and rank
Over 30 Oct–28 Nov 2026 (UTC), Capenhurst earned £86,724/MW/yr (365 × revenue / physical MW / eligible calendar days), ranked 52 of 196 GB battery assets by revenue per MW. The fleet median for the same window was £61,826/MW/yr. Capenhurst earned 40% above the fleet median. The fleet mean for the same window was £57,816/MW/yr. Capenhurst earned 50% above the fleet mean.
Its largest revenue stream was Wholesale, at £58,968/MW/yr or 68% of its total.
It is in the middle half of ranked assets (top 27% by rank).
| Market | £/MW/year |
|---|---|
| Capacity Market | £17,397 |
| Wholesale | £58,968 |
| Imbalance | −£5,571 |
| BM | −£1,198 |
| QR | £15,255 |
| SR | £1,874 |
| Total | £86,724 |
Market codes: BM = Balancing Mechanism; QR = Quick Reserve; SR = Slow Reserve.
Revenue figures are modelled from market and settlement data and checked against operators' actual revenue.
Published facts
- Dashboard power basis
- 57.00 MW
- Recorded duration
- 2.74 hours
- Storage type
- Storage (cycling ratio 0.83 over 40 weeks)
- Observed energy lower bound
- 156.09 MWh
- Recorded optimiser
- EDF Energy Customers Limited
- Registered party
- HD888CAP Ltd
- National Grid IDs
- CAPNB-1
- BMU IDs
- T_CAPNB-1
- CMU IDs
- CAP024
- First observed activity
- 28 Oct 2025, 00:00 UTC
- Latest recorded activity
- 29 Nov 2026, 23:00 UTC (scheduled or contracted, after publication)
Location
Postcodes: CH66 2HJ
Data published 29 Nov 2026, 02:05 UTC
Related assets
- Same site name: Capenhurst 4, Capenhurst 1, Capenhurst 3, Capenhurst 2
- Similar duration, nation and power: #19 Ocker Hill (57 MW · 164 MWh, £106,949/MW/yr), #151 Swindon (19 MW · 54 MWh, £32,549/MW/yr)