Minety South 2
Minety South 2 battery storage in Great Britain: published identity, approximate location, dispatch and revenue.
Revenue and rank
Over 30 Oct–28 Nov 2026 (UTC), Minety South 2 earned £49,787/MW/yr (365 × revenue / physical MW / eligible calendar days), ranked 131 of 196 GB battery assets by revenue per MW. The fleet median for the same window was £61,826/MW/yr. Minety South 2 earned 19% below the fleet median. The fleet mean for the same window was £57,816/MW/yr. Minety South 2 earned 14% below the fleet mean.
Its largest revenue stream was DC, at £32,109/MW/yr or 64% of its total.
It is in the middle half of ranked assets (bottom 34% by rank).
| Market | £/MW/year |
|---|---|
| FFR | £0 |
| Capacity Market | £8,858 |
| Wholesale | −£14,183 |
| BM | £23,387 |
| BR | £0 |
| DC | £32,109 |
| DM | £0 |
| DR | −£384 |
| QR | £0 |
| Total | £49,787 |
Market codes: FFR = Firm Frequency Response; BM = Balancing Mechanism; BR = Balancing Reserve; DC = Dynamic Containment; DM = Dynamic Moderation; DR = Dynamic Regulation; QR = Quick Reserve.
Revenue figures are modelled from market and settlement data and checked against operators' actual revenue.
Related assets
- Same site name: Minety South
- Similar duration, nation and power: #30 Creyke Beck (50 MW · 59 MWh, £99,191/MW/yr), #94 Tollgate (49 MW · 52 MWh, £62,508/MW/yr)