Native River
Native River is a battery energy storage asset in Great Britain. This page shows its published identity, approximate location, dispatch and revenue.
Revenue and rank
Over 30 Oct–28 Nov 2026 (UTC), Native River earned £92,771/MW/yr (365 × revenue / physical MW / eligible calendar days), ranked 37 of 196 GB battery assets by revenue per MW. The fleet median for the same window was £61,826/MW/yr. Native River earned 50% above the fleet median. The fleet mean for the same window was £57,816/MW/yr. Native River earned 60% above the fleet mean.
Its largest revenue stream was Wholesale, at £61,170/MW/yr or 66% of its total.
It is in the top quartile of ranked assets (top 19% by rank).
| Market | £/MW/year |
|---|---|
| Capacity Market | £15,392 |
| Wholesale | £61,170 |
| Imbalance | £3,686 |
| BM | £5,736 |
| BR | £0 |
| DC | £2,057 |
| DM | −£164 |
| DR | £2,150 |
| QR | £1,282 |
| SR | £1,461 |
| Total | £92,771 |
Market codes: BM = Balancing Mechanism; BR = Balancing Reserve; DC = Dynamic Containment; DM = Dynamic Moderation; DR = Dynamic Regulation; QR = Quick Reserve; SR = Slow Reserve.
Revenue figures are modelled from market and settlement data and checked against operators' actual revenue.
Published facts
- Dashboard power basis
- 57.00 MW
- Recorded duration
- 2.45 hours
- Storage type
- Storage (cycling ratio 0.84 over 75 weeks)
- Observed energy lower bound
- 139.75 MWh
- Recorded optimiser
- ARENKO CLEANTECH LIMITED
- Registered party
- Arenko Cleantech Limited
- National Grid IDs
- NTRVB-1, NTVRB-1
- BMU IDs
- T_NTRVB-1
- CMU IDs
- VAR005
- First observed activity
- 29 Nov 2024, 00:00 UTC
- Latest recorded activity
- 29 Nov 2026, 23:00 UTC (scheduled or contracted, after publication)
Location
Postcodes: CH1 6ER
Data published 29 Nov 2026, 02:05 UTC
Related assets
- Similar duration, nation and power: #77 Bramford (57 MW · 137 MWh, £76,299/MW/yr), #16 Pillswood 1 (50 MW · 93 MWh, £109,911/MW/yr)