Oldham is a battery energy storage asset in Great Britain. This page shows its published identity, approximate location, dispatch and revenue.
Revenue and rank
Over 30 Oct–28 Nov 2026 (UTC), Oldham earned £73,563/MW/yr (365 × revenue / physical MW / eligible calendar days), ranked 83 of 196 GB battery assets by revenue per MW. The fleet median for the same window was £61,826/MW/yr. Oldham earned 19% above the fleet median. The fleet mean for the same window was £57,816/MW/yr. Oldham earned 27% above the fleet mean.
Its largest revenue stream was Wholesale, at £48,174/MW/yr or 65% of its total.
It is in the middle half of ranked assets (top 43% by rank).
| Market | £/MW/year |
|---|---|
| Capacity Market | £6,548 |
| Wholesale | £48,174 |
| Imbalance | £3,523 |
| BM | −£21,551 |
| BR | £0 |
| DC | £35,494 |
| DM | £6,764 |
| DR | −£5,389 |
| QR | £0 |
| Total | £73,563 |
Market codes: BM = Balancing Mechanism; BR = Balancing Reserve; DC = Dynamic Containment; DM = Dynamic Moderation; DR = Dynamic Regulation; QR = Quick Reserve.
Revenue figures are modelled from market and settlement data and checked against operators' actual revenue.
Published facts
- Dashboard power basis
- 20.00 MW
- Recorded duration
- 0.96 hours
- Storage type
- Storage (cycling ratio 0.79 over 203 weeks)
- Observed energy lower bound
- 19.29 MWh
- Recorded optimiser
- Statkraft Markets GmbH, Virmati Energy Ltd
- Registered party
- Field Oldham Ltd, Statkraft Markets Gmbh
- National Grid IDs
- OLDHB-1, AG-GSTK05
- BMU IDs
- 2__GSTAT005, E_OLDHB-1
- CMU IDs
- 22OLD1, SHW011
- First observed activity
- 5 Nov 2022, 23:30 UTC
- Latest recorded activity
- 29 Nov 2026, 23:00 UTC (scheduled or contracted, after publication)
Location
Postcodes: OL9 9XB
Data published 29 Nov 2026, 02:05 UTC
Related assets
- Similar duration, nation and power: #59 Hulley Road (20 MW · 18 MWh, £83,792/MW/yr), #138 Gipsy Lane (18 MW · 15 MWh, £44,171/MW/yr)