Stockbridge (Winchester)
Stockbridge (Winchester) battery storage in Great Britain: published identity, approximate location, dispatch and revenue.
Revenue and rank
Over 30 Oct–28 Nov 2026 (UTC), Stockbridge (Winchester) earned −£45,555/MW/yr (365 × revenue / physical MW / eligible calendar days), ranked 195 of 196 GB battery assets by revenue per MW. The fleet median for the same window was £61,826/MW/yr. Stockbridge (Winchester) earned 174% below the fleet median. The fleet mean for the same window was £57,816/MW/yr. Stockbridge (Winchester) earned 179% below the fleet mean.
It is in the bottom quartile of ranked assets (bottom 2% by rank).
| Market | £/MW/year |
|---|---|
| Capacity Market | £10,229 |
| Wholesale | −£173,581 |
| BM | £1,474 |
| DC | £4,644 |
| DM | £0 |
| DR | £111,679 |
| Total | −£45,555 |
Market codes: BM = Balancing Mechanism; DC = Dynamic Containment; DM = Dynamic Moderation; DR = Dynamic Regulation.
Revenue figures are modelled from market and settlement data and checked against operators' actual revenue.
Related assets
- Similar duration, nation and power: #146 Lower Road (10 MW · 5.5 MWh, £37,931/MW/yr), #149 Battery Lane (10 MW · 9.9 MWh, £35,946/MW/yr)